Wielton stand at IAA 2016.
Photo by Spielvogel For a gallery of some more of my uploaded pictures see: here . on Wikimedia Commons, CC0 1.0

Costs and pricing

Part of Exhibition stand hire vs purchase: a cost comparison for UK exhibitors

Exhibition stand hire vs purchase: a cost comparison for UK exhibitors

Compare exhibition stand hire against buying for UK shows: VAT treatment, storage and depreciation, with a worked cost table and lead-time guidance.

What to take away

  • Hire suits one or two shows a yearone fee, no storage afterwards.
  • Buying rewards repetitionusing the same structure at four or five events usually beats hire.
  • VAT is recoverable on either route if you are registered.
  • Compare cost per show over three years, not the first invoice.

The hire case: one fee, one show

Hiring bundles design, build, transport, installation and dismantling into a single fee for a named event. The contractor keeps the structure afterwards, so you never pay for a warehouse, a van or a skip. Graphics and furniture are usually quoted separately and priced by area.

Hire also keeps your calendar flexible. If a show is cancelled or the budget moves, you simply do not book. The trade-off is that you pay the build cost again next time, and you rarely get the same stand twice.

Benchmark rates before comparing quotes. Our guide to exhibition stand cost per square metre sets out what UK contractors include in a hire fee, from electrics to rigging.

The buy case: the invoice is only the start

Ownership brings costs that hiring hides. Storage is charged monthly and scales with the stand's footprint. Structures need re-skinning or refurbishment after a heavy season. A build written down over three or four years may be worth little when you stop exhibiting.

Copyright is a separate question from the panels themselves. Commission a bespoke build and copyright in the drawings stays with the designer unless the contract assigns it, which is the default under the Copyright, Designs and Patents Act 1988. Ask for a written assignment if you plan to reuse the design with another contractor.

VAT, cash flow and price movement

VAT is charged at the standard rate on stand hire and on most build services. If you are VAT-registered you reclaim input VAT through your normal return, as set out in the GOV.UK guidance on charging, reclaiming and recording VAT. Hire spreads that claim across payments; a purchase puts it all in one period.

Exhibitors who are not registered cannot reclaim anything, so hire keeps the VAT bill smaller in any single year.

Rebuild and material costs move over time. The ONS inflation and price indices are the place to check how those costs have shifted before fixing a three-year budget.

A worked comparison

On these illustrative figures, three shows on hire cost £15,900. The owned stand reaches about £18,900 once storage and one refresh are added, so ownership becomes cheaper from the fifth show. Change the storage rate or the show count and the crossover moves.

Hire vs Buy: Three-Show Cost

Hire, one show

Design and build
£4,500
Graphics
£800
Transport, install, dismantle
included
Storage between shows
none
Total across three shows
£15,900

Buy, owned stand

Design and build
£9,000
Graphics
£1,200 then £900
Transport, install, dismantle
£1,400 a show
Storage between shows
£150 a month
Total across three shows
about £18,900

Hire, one show

Design and build
£4,500
Graphics
£800
Transport, install and dismantle
included
Storage between shows
none
Total across three shows
£15,900

Buy, owned stand

Design and build
£9,000
Graphics
£1,200, then £900 a show
Transport, install and dismantle
£1,400 a show
Storage between shows
£150 a month
Total across three shows
about £18,900

Lead times and booking windows

Lead times matter as much as price, and contractors count them from design sign-off rather than from your enquiry. A late hire booking means fewer build slots and less choice of system.

Buying shifts the balance after the first build. You own the structure, so a later booking is a transport job rather than a manufacturing one. The trade-off is a longer first cycle and a design you may outgrow.

If you expect to change stand shape between halls, modular versus custom stands explains which systems survive repeated rebuilds.

How to decide

  1. Count the shows you will attend over three years and note the stand size for each.
  2. Ask contractors what the hire fee excludeselectrics, rigging, furniture and waste removal are common extras.
  3. Get a written storage rate per month and a refresh cost per show for anything you would own.
  4. Work out cost per show for both routes, then adjust for VAT and for a design you can reuse.
  5. Check who owns the design and whether the contract allows you to move it to another supplier.

Common questions

Is hiring a stand cheaper than buying one?

For one show, yes: hire avoids storage, refurbishment and disposal. Buying usually wins once the same structure is used at four or five events.

Can I reclaim VAT on exhibition stand hire?

Yes, if your business is VAT-registered and the stand is used for business purposes. The VAT goes through your normal return rather than being claimed at the show.

Do I own the design of a bespoke stand?

Rarely, unless the contract says so. Copyright in the drawings stays with the designer by default, so ask for a written assignment before reusing the design elsewhere.

More in Costs and pricing